Studio Progress 2012
With two weeks left before Final Review, the studio has made great progress. As a group, the students resolved a schematic design for the home and have proceeded to work on individual projects within the scope of the design.
Among other things, they are determining the R-values of walls, window schedules, stair construction and a rain water catchment system.
See photos from studio below:
You must be logged in to post a comment.